| Gezende Dam |
|---|
 Gezende reservoir near Evsin, view to the southeast |
| Location | Turkey |
|---|
| Construction began | 1979 |
|---|
| Opening date | 1990 |
|---|
|
| Type of dam | Concrete arch |
|---|
| Impounds | Ermenek River |
|---|
| Height | 75 m (246 ft) |
|---|
|
| Total capacity | 92,000,000 m3 (74,586 acre⋅ft) |
|---|
|
| Installed capacity | 159 MW |
|---|
| Annual generation | 528 GWh |
|---|
Gezende Dam is an arch dam on the Ermenek River in Mersin Province, Turkey. The development was backed by the Turkish State Hydraulic Works.
Gezende reservoir near Evsin, view to the south.
See also
References
|
|---|
Settlements |
|---|
| Center city | |
|---|
Districts (İlçe) | |
|---|
| All settlements |
- List of populated places in Mersin Province
|
|---|
|
|
Culture |
|---|
| Universities | |
|---|
| Museums etc. | |
|---|
| Monuments | |
|---|
Archaeological wealth | |
|---|
| others | |
|---|
|
|
Buildings and structures |
|---|
| Modern | |
|---|
Mosques and madrasas | |
|---|
| Churches | |
|---|
| Cemeteries | |
|---|
| Dams | |
|---|
| Industry and trade | |
|---|
| Transportation | |
|---|
| Sports venues | |
|---|
|
|
|
|
Power stations in Turkey |
|---|
| Nuclear | | |
|---|
Renewable energy | | Geothermal |
- Gümüşköy – 13 MW
- Kızıldere – 95 MW
|
|---|
| Hydroelectric |
- Adıgüzel – 62 MW
- Akköprü – 115 MW
- Aksu – 13 MW
- Alaköprü – 26 MW
- Alkumru – 265.5 M
- Almus – 27 MW
- Alpaslan-1 – 160 MW
- Alpaslan-2 – 280 MW
- Altınkaya – 700 MW
- Arkun – 237 MW
- Artvin – 340 MW
- Aslantaş – 138 MW
- Atasu – 5 MW
- Atatürk – 2,400 MW
- Bahçelik – 7 MW
- Batman – 160 MW
- Berdan – 10 MW
- Berke – 510 MW
- Birecik – 672 MW
- Borçka – 300 MW
- Boyabat – 513 MW
- Burç Bendi – 27.9 MW
- Çamlıgöze – 33 MW
- Çatalan – 169 MW
- Çetin – 405 MW
- Çınarcık – 100 MW
- Cindere – 29 MW
- Çine – 47 MW
- Cizre −240 MW
- Demirköprü – 69 MW
- Derbent – 58 MW
- Deriner – 670 MW
- Devecikonağı – 29 MW
- Dicle – 110 MW
- Ermenek – 300 MW
- Garzan – 49 MW
- – 159 MW
- Gökçekaya – 278 MW
- Gönen – 11 MW
- Güllübağ – 96 MW
- Gürsöğüt −242 MW
|
|---|
| Solar |
- Greenway CSP Mersin – 6 MW
- Karapınar – 1,000 MW
|
|---|
| Waste |
- Istanbul Waste Power Plant
|
|---|
| Wind |
- Aliağa – 193 MW
- Bahçe – 135 MW
- Çanta – 47.5 MW
- Dağpazarı – 39 MW
- Mut – 33 MW
- Şamlı – 174 MW
- Soma – 140.4 MW
|
|---|
|
|---|
| Fossil | | Coal-fired |
- Afşin-Elbistan C – 1800 MW proposed
- Afşin-Elbistan B – 1440 MW
- ZETES-3 – 1400 MW
- Afşin-Elbistan A – 1355 MW
- Cenal – 1320 MW
- Emba Hunutlu – 1320 MW
- İsken Sugözü – 1308 MW
- ZETES-2 – 1230 MW
- Atlas – 1200 MW
- Bekirli – 1200 MW
- Soma – 990 MW
- Kemerköy – 653 MW
- Yatağan – 630 MW
- Çayırhan – 620 MW
- Seyitömer – 600 MW
- Soma Kolin – 510 MW
- Kangal – 457 MW
- Tufanbeyli – 450 MW
- Yeniköy – 420 MW
- Biga – 405 MW
- Şırnak Silopi – 405 MW
- Tunçbilek – 365 MW
- İzdemir – 350 MW
- Çan-2 – 330 MW
- 18 Mart Çan – 320 MW
- Çatalağzı – 315 MW
- Bolu Göynük – 270 MW
- Orhaneli – 210 MW
- Çolakoğlu – 190 MW
- ZETES-1 – 160 MW
- List of active coal-fired
- Silahtarağa – now museums
|
|---|
| Gas-fired |
- Gebze - 1540 MW
- Unimar Marmara Ereğlisi – 480 MW
|
|---|
|
|---|
Power stations projected or under construction in italics |
36°32′02″N 33°11′26″E / 36.534°N 33.1906°E / 36.534; 33.1906